White River Flowage Lake Management District
Home
Meetings
Board/Contact
Projects/News
Association
Links

Harvester Information

  Visit our harvester page

EWM/CLP

  Plan to apply for 3 year grant
     2019/20/21 for  treatment.

​2016 Survey and treatment
2015 Survey EWM
2015 Survey CLP
2013 Survey
2013 Treatment
2011 Treatment


Silt/Muck problem in channel

2014/15/16/17
  DNR work on White River upstream from the
     Flowage (increasing water flow and returning  
     river to original channel) has improved the 
     North End of the Flowage.
2013
  Summary June 2013
  Report July 2013
2012
   Surge of silt from upstream caused the channel in        the north end to become very shallow.   
   Several meetings were held with the DNR to      
      determine possible actions to help the situation.
   After discussion with the owners of the dam on 
      YY, it was determined that a draw down would          be too expensive to the District.


FR
Identification
    Pictures
    Quick Guide

2017
    Pictures FRhunting  FRpulling
                  FRtransport  Cleanboats
2016  ​ 
   July2016 Survey Map
  ​ WLP (Chemical)   Treatment
   GS (Hand Pulling)
      Flowage Map   Primary Area Map
      Report
2015
  Discovered in Flowage  Survey Map
  Grant - Hand Pulling 2015/16/17
      Chem treatment - added 2016

Lake Plan Information
  2013 WausharaWhiteRiverFlowagestudy
  2015 WhiteRiverFlowage Study

Lake Plan Approved (5/11/2016)
  White River Flowage Pan-5/11/2016
      a.  addendums
            page 23apage 26apage 38a